Ongoing ProjectHighway & Urban Road Engineering

AA-20 – Improvement of Road from Chhatrapati Shivaji Maharaj Statue to Dr. Babasaheb Ambedkar Chowk to Satkar Point at Nashik Road

Nashik Road, Maharashtra

Urban roadway improvement from Shivaji Maharaj Statue to Ambedkar Chowk and Satkar Point at Nashik Road with concrete and bituminous pavement.

AA-20 – Improvement of Road from Chhatrapati Shivaji Maharaj Statue to Dr. Babasaheb Ambedkar Chowk to Satkar Point at Nashik Road - Highway & Urban Road Engineering infrastructure project in Nashik Road, Maharashtra
LocationNashik Road, Maharashtra
Nature of WorkConcrete + Bituminous
Authority / ClientNashik Municipal Corporation (NMC)
Project Statusongoing
PROJECT OVERVIEW

Context & Technical Background

A flagship urban transport infrastructure upgrade spanning high-traffic civic junctions in Nashik Road from Chhatrapati Shivaji Maharaj Statue through Dr. Babasaheb Ambedkar Chowk to Satkar Point. The scope focuses on widening, pavement strengthening, concrete and bituminous surfacing, and utility/drainage coordination to withstand heavy urban vehicular loads.

CONSULTANCY & PMC SCOPE

Scope of Professional Services

Key project management, engineering supervision, and technical assurance deliverables administered for this assignment:

  • Continuous Project Management Consultancy (PMC) and site engineering supervision
  • Review and validation of contractor methodology, work sequencing, and equipment deployment
  • Independent QA/QC testing for raw aggregates, concrete cubes, and bitumen mix designs
  • Geometric alignment, camber, and elevation checks during sub-base and pavement construction
  • Running Account (RA) bill inspection, joint measurements, and quantity reconciliation
  • Stakeholder coordination with NMC, Kumbh Mela authorities, traffic police, and utility agencies
  • Comprehensive documentation, photographic logging, and periodic progress reporting
KEY HIGHLIGHTS

Technical Specifications & Features

Feature 1

Pavement Technology: Engineered concrete and high-performance bituminous surface courses

Feature 2

Civic Importance: Interlinks premier central commercial and civic junctions at Nashik Road

Feature 3

Traffic Management: Phased construction sequencing maintaining daily urban vehicular flow

Feature 4

Client Engagement: Executed under S. B. Constructions PMC supervision

PROJECT GALLERY

Site Photographs & Media

Representative photographs depicting alignment execution, materials inspection, and site coordination.

AA-20 – Improvement of Road from Chhatrapati Shivaji Maharaj Statue to Dr. Babasaheb Ambedkar Chowk to Satkar Point at Nashik Road - Photograph 1
01 / 03
EXPLORE MORE
Development of Road from Nandur Bridge to Jatra Hotel (Approach to Ghats)
Ongoing
Highway & Road Infrastructure

Development of Road from Nandur Bridge to Jatra Hotel (Approach to Ghats)

Highway corridor and ghat approach road development connecting Nandur Bridge to Jatra Hotel in Nashik, strengthening regional freight connectivity.

Nashik, Maharashtra
Work: Road & Ghat Approach Construction
Authority: Nashik Municipal Corporation (NMC)
Client:Rushabh Construction
Project Value:Approx. ₹44.00 Crore