
AA-19 – Development of Maldhakka Road and Railway Station Connecting Roads at Nashik Road
Development and structural improvement of Maldhakka Road and railway station connecting roads at Nashik Road with concrete and bituminous pavement.
White Topping concrete overlay construction across the central civic corridor connecting Mumbai Naka, Gadkari Signal, and Trimbak Naka in Nashik.

This high-profile urban project implements White Topping concrete overlay technology over one of Nashik's busiest arterial corridors connecting Mumbai Naka to Gadkari Signal and onward to Trimbak Naka. White topping applies a high-strength concrete layer over the existing bituminous pavement, providing long-term structural integrity, eliminating recurring potholes, and offering maximum resistance to monsoon degradation.
Key project management, engineering supervision, and technical assurance deliverables administered for this assignment:
Engineering Technology: High-strength White Topping rigid concrete overlay
Central Arterial: Major connecting corridor between Mumbai Naka, Gadkari Signal, and Trimbak Naka
Longevity & Performance: Superior load distribution and flood-resilient pavement life cycle
Client Engagement: Executed under S. B. Constructions PMC supervision
Representative photographs depicting alignment execution, materials inspection, and site coordination.


Development and structural improvement of Maldhakka Road and railway station connecting roads at Nashik Road with concrete and bituminous pavement.

Urban roadway improvement from Shivaji Maharaj Statue to Ambedkar Chowk and Satkar Point at Nashik Road with concrete and bituminous pavement.

Highway corridor and ghat approach road development connecting Nandur Bridge to Jatra Hotel in Nashik, strengthening regional freight connectivity.
Speak directly with our project management team to discuss technical consultancy, QA/QC oversight, and disciplined execution support.