
AA-19 – Development of Maldhakka Road and Railway Station Connecting Roads at Nashik Road
Development and structural improvement of Maldhakka Road and railway station connecting roads at Nashik Road with concrete and bituminous pavement.
Highway corridor and ghat approach road development connecting Nandur Bridge to Jatra Hotel in Nashik, strengthening regional freight connectivity.

A premier infrastructure assignment linking Nandur Bridge with the Jatra Hotel junction, functioning as the vital approach corridor to the ghat section for regional traffic. Under appointment by Rushabh Construction for the Nashik Municipal Corporation project, Milestone Consultancy provides end-to-end PMC oversight across road formation, slope stabilization, cross-drainage, and multi-layer pavement works.
Key project management, engineering supervision, and technical assurance deliverables administered for this assignment:
Project Scale: Balance project value available for billing is approximately ₹44.00 Crore
Strategic Corridor: Key regional ghat approach connecting Nandur Bridge to Jatra Hotel
Heavy Transit Engineering: Earthworks, reinforced culverts, and high-load pavement structure
Consultancy Deliverables: Quality control audits, joint measurements, and executive progress monitoring
Representative photographs depicting alignment execution, materials inspection, and site coordination.


Development and structural improvement of Maldhakka Road and railway station connecting roads at Nashik Road with concrete and bituminous pavement.

Urban roadway improvement from Shivaji Maharaj Statue to Ambedkar Chowk and Satkar Point at Nashik Road with concrete and bituminous pavement.

White Topping concrete overlay construction across the central civic corridor connecting Mumbai Naka, Gadkari Signal, and Trimbak Naka in Nashik.
Speak directly with our project management team to discuss technical consultancy, QA/QC oversight, and disciplined execution support.